Construction Progress - August 2008
September 20, 2008
Construction Progress - August 2008
August 6, 2008
Construction Progress - July 2008
July 9 , 2008
Construction Progress - June 2008
June 4 , 2008
Construction Progress - May 2008
May 2, 2008
Construction Progress - April 2008
April 7, 2008
Construction Progress - March 2008
March 4, 2008
Construction Progress - February 2008
February 15, 2008
Construction Progress - January 2008
January 18, 2008
Construction Progress - December 2007
December 7, 2007
CCA announces principal for North Bend Elementary
October 23, 2007
Construction Progress at new facility sites
October 4 & 11 2007
New attendance areas and grade level configurations
September 10 , 2007
New High School and North Bend Construction Progress
August 2, 2007
Photo of new High School groundbreaking ceremony
July 27, 2007
New facilities site plans
July 18, 2007
New CCA High School Groundbreaking Ceremony - JULY 31
May 4, 2007
Groundbreaking unveils new name for elementary school.
March 29, 2007
New Elementary Floor Plan revision
February 2007
District Prepares for New Elementary School Bids
  Final Design Specifications Established for New Elementary
  PDF of New Elementary Floor Plan
revised March 29, 2007
  New High School Design Nearing Completion; List of design features revised 2.28.07
  Frequently Asked Questions
 

pdf February 2007 Facility Projects Update (PDF)

   


Construction Progress Report


back to topSeptember 2008

Middle School Parking Lot

Work completed:

  • Finished installing sub- grade rock, storm sewer piping and
    started final grading on the site
  • Completed the parking lot paving
  • Working on the underground wiring for tennis courts and the bus parking

 

North Bend Elementary School

Work completed:

  • Finished the punch list items and cleaning up the building
  • Finished cleaning up the exterior, working on the sign base and trash confinement
    Installing parking lot lights
  • Reviewed the seeding and mowed the weeds
  • Poured the sidewalk to the north out to the lake walk
  • Sealing up the entrances and installing door seals
  • Working to clean up the freezer
  • HVAC computer system hooked up with the school system and working on programming
  • Training and testing on the fire protection panels and equipment
  • PA system is working
  • Playgrounds have been completed

The exterior work punch list still has some rocks and drains to be fixed.
The exterior signage is yet to be completed.

 

New High School

Work completed:

  • Working on storm water ponds and grading bile swale
  • Pouring interior slabs, installing wood framing for the roofers and installing door frames for the masonry contractor
  • Installed electrical boxes and conduit for the masons and installing bases for the exterior parking lot lights
  • Installing wall plumbing for the masonry walls and installing interior piping
  • Constructed brick veneer walls around the exterior and interior bearing walls for the second floor
  • Working on west bearing walls at the common area
  • Erected floor joists and structural steel for 2nd floor in the center section of the building
  • Installing AHU equipment and geo-thermal lines
  • Installing duct work in the gym and north section
  • Completed roofing the north section
  • Installing the geo thermal field
  • Working on the front entrance road and the fire lane
  • Installing metal studs and have started to drywall one side in the gym
  • Painting has started in the gym

The project is still behind about 45 working days because of the bad weather.

 


Construction Progress Report


back to topAugust 2008

Middle School Parking Lot

Work completed:

  • Rathje Construction has finished rough grading, installed sub-drain and installed sub- grade rock on the site.

Problems encountered:

  • Electrical lines to the tennis court had to be relocated and new conduit installed.
    Electrical conduits at the east end had to be rerouted for the buses and yard light.
    Rahje and Shive-Hattery did a wheel test on the area that was ready.
  • Rahje is about two weeks behind due to the weather and getting shop drawing approved.

North Bend Elementary School

Work completed:

  • Finished the punch list items and cleaning up the building
  • Finished cleaning up the exterior, working on the sign base and trash confinement
  • Installing Parking lot light bases
  • Finished the hydro-seeding
  • Poured the south parking lot
  • Sealing up the entrances
  • Painting the trash gates
  • Working on HVAC programming
  • Training and testing on the fire protection panels and equipment
  • Exterior signage is yet to be completed
  • Playgrounds have been completed

New High School

Work completed:

  • Working on storm water ponds and grading frontage roads
  • Pouring interior slabs, installing wood framing for the roofers and installing door frames for the masonry contractor
  • Preparing the sub grade for interior floor slabs in the center section
  • Installed electrical boxes and conduit for the masons and installing conduit for the exterior parking lot lights
  • Installing wall plumbing for the masonry walls and installing interior piping
  • Constructed concrete block walls around the exterior and interior bearing walls for the second floor
  • Erected floor joists and structural steel for 2nd floor in the center and north sections of the building
  • Received and installing AHU equipment
  • Installing their duct work in the gym and north section
  • Completed roofing the north section
    Working on installing the geo thermal field starting at the east end and working west and has installed the geo-vault
  • Placed concrete on most of the parking area and working on the frontage roads and the fire lane
  • Most of the metal studs installed in the north section and working in the gym

The project is still behind about 45 working days because of the continued bad weather, but can still make up the lost time.

 


Construction Progress Report


back to topJuly 2008

North Bend Elementary School

Work completed and in process:

  • Finished the punch list items and cleaning up the building
  • Finished cleaning up the exterior, working on the sign base and trash confinement
  • Installing light fixtures
  • Doing site grading and misc. cleanup
  • Placing black dirt and getting ready to seed
  • Started prep work for hydro-seeding
  • Poured the west parking area around the bus loop and prepping
    the south parking lot
  • Painting the door frames and touching up paint though out the building                                                                                        
  • Exterior punch list items to be completed
  • Installed the vct, carpet flooring and vinyl base
  • Working on HVAC controls and has started the equipment
  • Had some training and testing on the fire protection panels and equipment
  • The exterior work is 95% complete. Shive-Hattery has to complete a punch list.
  • The interior and exterior signage is yet to be installed
  • The play grounds have to be completed

 

New High School

Work completed and in process:

  • Repaired sub grade for the parking lots and frontage road
  • Pouring interior slabs and wood framing for the roofer
  • Installing door frames for the masonry contractor
  • Preparing the sub grade for interior floor slabs in the north section
  • Installed electrical boxes and conduit for the masons and installing conduit for the exterior parking lot lights
  • Installing wall plumbing for the masonry walls and installing interior piping
  • Constructed concrete block walls around the exterior and interior bearing walls, laying brick and stone veneer
  • Repairing sub grade and installing water main and drain lines in parking lots
  • Erected floor joists and structural steel for 2nd floor in the center and north sections of the building
  • Installing AHU equipment
  • Installing their duct work in the gym and surrounding area
  • Completed roofing the gym and music room
  • Working on installing the geo thermal field starting at the east end and working west
  • Placed sub-base rock for the parking lot and poured concrete on most of the parking area
  • Working on the frontage roads and the fire lane
  • The project is still behind about 30 working days because of the continued bad weather, but MLC says they can still make up the lost time.


Construction Progress Report


back to topJune 2008

North Bend Elementary School

Work completed and in process:

  • Completing the punch list items and cleaning up the building.
  • Cleaning up the exterior, working on the sign base and trash confinement.
  • Installing light fixtures and setting up parking lot lights.
  • Site grading and misc. cleanup.
  • Placing black dirt and getting ready to seed.
  • Poured the west drive, poured sidewalk connections, bus loop.
  • Installed the windows and working on the interior windows as the painter gets the frames painted.
  • Painting the door frames and touching up paint thought out the building.
  • Completed punch list of mechanical items.
  • Exterior punch list items to be completed.
  • Completed the installation of the basketball back boards, score broads and gym equipment.
  • Installed the vct, carpet flooring and vinyl base.
  • Working on HVAC controls and has started the equipment.
  • Training and testing on the fire protection panels and equipment.

The building interior is substantially complete. A punch list was compiled by Shive-Hattery. MLC has completed the items on the list. MLC compiled a list of items that are late and should be done by 6/30/08. The City of North Liberty, punch list of items that needed to be completed for substantial completion has been answered.

New High School

Work completed and in process:

  • Repaired sub grade for the parking lots.
  • Pouring interior slabs as weather permits.
  • Installing door frames for the masonry contractor.
  • Preparing the sub grade for interior floor slabs in the gym.
  • Installed electrical boxes and conduit for the masons and installing conduit for the exterior parking lot light.
  • Installing wall plumbing for the masonry walls and installing interior piping.
  • Constructed concrete block walls around the exterior and interior bearing walls, laying brick and stone veneer.
  • Repairing sub grade and installing water main and drain lines in parking lots.
  • Erected floor joists and structural steel for 2nd floor in the center and north sections of the building.
  • Received and installing AHU equipment.
  • Installing duct work in the gym and surrounding area.
  • Completed roofing the gym and music room.
  • Installed the main geo lines into the building and working on installing the geo thermal field.
  • Placed sub-base rock for the parking lot and poured concrete on most of the parking area.

The project is still making progress regardless of the continued bad weather, but MLC says they can still make up the lost time.



back to topConstruction Progress Report

May 2008

North Bend Elementary

Work completed and in process:

  • Setting millwork and counter tops in the class rooms and main office.
  • Cleaning up the exterior, interior of the building and hanging misc. doors.
  • Installing electrical boxes, installing switch gear, light switches, light fixtures, wiring kitchen equipment, wall plugs and setting up exterior lights.
  • Site grading and misc. cleanup and placing black dirt and getting ready to seed
  • Completed all of geo-thermal work on the headers and testing of the loops in the geo field and mechanical room.
  • Completed all the drywall in the classrooms and the center corridor.
  • Poured the east drive, sidewalk connections, bus loop and the west drive.
  • Installed the windows and working on the interior windows as the painter gets the frames painted.
  • Installing, pulling wire and installing switch gear.
  • Painting the door frames and touching up paint thought out the building completed installing, testing water lines and connecting up air handling equipment.
  • Installing splinter mains and drops. Testing is completed.
  • Completed the terrazzo flooring.
  • Completed the exterior window flashing and exterior metal siding.
  • Completed the installation of the basketball back boards.
  • Installed the vct, carpet flooring and vinyl base.
  • Gym floor is installed and finished.
  • Working on mechanical controls and getting ready to start equipment.
  • Some training and testing on the fire protection panels and equipment.

New High School building

Work completed and in process:

  • Repaired sub grade for the parking lots.
  • Pouring interior slabs as weather permits.
  • Installing door frames for the masonry contractor.
  • Reparing the sub grade for interior floor slabs in the gym.
  • Installed electrical boxes and conduit for the masons and installing conduit for the exterior parking lots.
  • installing wall plumbing for the masonry walls and installing interior piping.
  • constructed concrete block walls around the exterior and interior bearing walls, laying brick and stone veneer.
  • Erected the roof trusses in the music room, the weight room and gym.
  • installing the roof decking on the above areas and installing joist and decking on the north section.
  • Received all of the AHU equipment.
  • Installing their duct work in the gym and surrounding area.
  • Completed roofing the gym and music room.
  • Installed the main geo lines into the building.
  • Placed sub-base rock for the parking lot area.


Construction Progress Report

April 2008

North Bend Elementary

Work Completed:

  • Setting millwork and counter tops in the class rooms and main office.
  • Cleaning up the exterior, interior of the building and working misc. door frames
  • Working on the flashing and roof openings.
  • Installing electrical boxes, installing switch gear, light switches, light fixtures, wiring kitchen equipment and wall plugs.
  • Completed all of the work on the headers and testing of the loops in the geo field and mechanical room.
  • Completed all the drywall in the classrooms and the center corridor .
  • Working on the sub grade and getting ready to pour the east drive.
  • Poured sidewalk connections and part of the bus loop.
  • Installed about 95% of the windows and working on the interior windows as the painter gets the frames painted.
  • Installing and pulling wire.
  • Painting the door frames on the west end of the building completed installing, testing water lines and connecting up air handling equipment.
  • Completed installing splinter mains and drops. Testing is completed.
  • Completed the terrazzo flooring and waiting to polish .
  • Completed the exterior window flashing and exterior metal siding.
  • Installing basketball back boards.
  • Started to install VCT and vinyl flooring .
  • Will start laying carpet on Monday, May 5, 2008.
  • Gym floor is being installed and is about 40% complete.
  • Working on controls and getting ready to start equipment.

New High School building

Work Completed:

  • Completed all of the interior footings and pouring interior slabs as weather permits.
  • Installing door frames for the masonry contractor.
  • Preparing the sub grade for interior floor slabs.
  • Installed electrical boxes and conduit for the masons.
  • Installing wall plumbing for the masonry walls.
  • Constructed concrete block walls around the exterior bearing walls, laying brick and stone veneer.
  • Erected the roof trusses in the music room, the weight room and gym .
  • Installing the roof decking on this area.
  • Received most of the AHU equipment.
  • Moved in some of the duct work and started to install.
  • Unloaded the big air exchange unit and placed it.
  • Moved in materials and started roofing the gym and music room.

The project is still behind due to the continued bad weather, but MLC says they can still make up the lost time.

 


Construction Progress Report

March 2008
back to top

North Bend Elementary

Work Completed:NBE construction

  • Setting millwork and counter tops in the class rooms.
  • Cleaning up the exterior, interior of the building and working misc. door frames.
  • Working on the flashing and roof openings.
  • Completed all the block laying and brick veneer till the entrance can be completed.
  • Installing electrical boxes, installing switch gear, light switches, light fixtures, wiring kitchen equipment and wall plugs.
  • Working on geo-thermal headers and testing loops in the geo field and mechanical room when the weather permits.
  • Completed all the drywall in the classrooms and the center corridor.
  • Installed about 95% of the windows and working on the interior windows as the painter gets the frames painted.
  • Installing and pulling wire.
  • Painting at the west end, has about 90% of the building completed and painting door frames and doors.
  • Installing and testing water lines they have completed about 95%. They are installing air handling equipment and are 90% complete.
  • Installing splinter mains and drops working. They are about 99% complete and are testing the main lines.
  • Working on the terrazzo flooring and are 85% complete with the flooring.
  • Installing the exterior window flashing and exterior metal siding and has completed 90% of the instillation. installing basketball back boards.
  • Started to install VCT and vinyl flooring.

 

New High School building

Work Completed:

  • Completed all of the interior footings and elevator shaft walls.
  • Building shelters and installing door frames for the masonry contractor.
  • Preparing the sub grade for interior slabs in the weight room.
  • Installed electrical boxes and conduit for the masons.
  • Installing wall plumbing for the masonry walls.
  • Constructed concrete block walls around the exterior bearing walls, laying
    brick and stone veneer. They have enclosed the south wall of the gym.
  • Erected the roof trusses in the music room, the weight room and gym. They are installing the roof decking on this area.
  • Received most of the AHU equipment.
  • Moved in some of the duct work and started to install.

The project is still behind due to the continued bad weather, but MLC says they can still make up.


Construction Progress Report

February 2008
back to top

North Bend Elementary

Work Completed:

  • Setting millwork and counter tops in the class rooms.
  • Cleaning up the exterior and interior of the building.
  • Completed the roofing on the building and waiting on the flashing to be completed.
  • Completed all the block laying and brick veneer till the entrance can be completed.
  • Installing electrical boxes, installing switch gear, light switches and wall plugs.
  • Working on headers and flanges in the mechanical room when the weather permits.
  • Completed all the drywall in the classrooms and working on the center corridor.
  • Installed about 95% of the windows and working on the main entrances ways.
  • Installing and pulling wire.
  • Painting at the west end and has about 80% of the building completed.
  • Installing water lines working in the west end and has about 90% complete.
  • Installing air handling equipment and are 60% complete.
  • Installing splinter mains and drops working east to west and are about 95% complete and are testing the main lines.
  • Working on the terrazzo flooring in the east bath rooms and east corridor.
  • Installing the exterior window flashing and exterior metal siding.

New High School building

Work Completed:

  • Completed 90% of the interior footings and elevator shaft walls.
  • Building shelters and installing door frames for the masonry contractor.
  • Installed electrical boxes and conduit.
  • Installing wall pumping for the masonry walls.
  • Constructed concrete block walls around the exterior bearing walls, laying brick .and stone veneer.
  • Erected the structural steel in the center of the building and Installed roof trusses in the music room, the weight room and gym.

The project continues to be behind schedule due to bad weather.


Construction Progress Report

January 2008
back to top

North Bend Elementary

Work Completed:

  • Forming and pouring housekeeping pads for equipment.
  • Enclosed the exterior of the building, and is heating the building so winter work can continue.
  • Setting door frames for masons and cleaning up the exterior and interior of the building.
  • Completed the roofing on the building and waiting on the flashing to be completed
  • Laying brick at the main entrance and they are also laying block on interior walls .
  • Completed the interior walls.
  • Installing electrical boxes and conduit in the floors, and installing switch gear .
  • Working on headers and flanges in the mechanical room.
  • Installing the metal stud walls and started dry walling in the east end and working to the west.
  • Installed about 95% of the windows and working on the main entrance ways.
  • Installing and pulling wire.
  • Painting at the east end and working west, has about 60% of the east section completed.
  • Installing water lines working from the east to the west, has about 70% complete.
  • Installing splinter mains and drops working east to west .

New High School building

Work Completed:

  • Completed 90% of the interior footings and elevator shaft walls.
  • Building shelters and installing door frames for the masonry contractor.
  • Installed electrical boxes and conduit.
  • Installing wall pumping for the masonry walls.
  • Constructed concrete block walls around the exterior bearing walls.
  • Erected the structural steel in the center of the building and unloaded roof trusses for the south section of the building.

The project is still behind due to the continued bad weather.

 


Construction Progress Report

December 2007
back to top

NBE

  • Forming and pouring housekeeping pads for equipment.
  • Enclosing exterior of the building so winter work can continue.
  • Setting door frames for masons.
  • Completed the roofing on the building and waiting on the flashing to be completed
  • Laying brick at the main entrance and they are also laying block on interior walls.
  • Will complete the interior walls mid- January.
  • Installing electrical boxes and conduit in the floors and block walls.
  • Installing the metal stud walls and will start dry walling as soon as there is heat in the building.
  • East parking lot poured with 2/3 of the drive poured. The bus loop is about 50% completed.

New High School building
The project is still about four weeks behind due to the continued bad weather.

hsdec07

  • Completed 85% of the interior footings.
  • Building shelters and installing door frames for the masonry contractor.
  • Installed electrical boxes and conduit.
  • Installing wall pumping for the masonry walls.
  • Constructed concrete block walls around the gym and music rooms.
  • Working on exterior bearing walls.
  • Installed the water main, storm sewers and sanitary sewers.
  • Erected the structural steel in the center of the building.


Clear Creak Amana announces principal for North Bend Elementary and administrative changes at Clear Creek Elementary
top

DECEMBER 07, 2007
The Clear Creek Amana School District is pleased to announce two new administrative appointments.  First, Brenda Parker, has been named principal of the new North Bend Elementary currently under construction in North Liberty, Iowa. Mrs. Parker has been the principal at Clear Creek Elementary in Oxford for the past four years. Starting January 1, 2008, she will begin preparation work for the opening of North Bend Elementary. Prior to completion of the new building, her office will be located at the West Campus in Tiffin.

Second, Dan Dvorak, has been named principal of Clear Creek Elementary.   He has served as the associate principal at Clear Creek Elementary for the past year and a half. Mr. Dvorak will be joined by Dave Krummel, who will be working as a School Administrative Manager.

top

Construction progress at new facility sites
October 2007

Due to all the rain and cool weather, the site work delayed at both sites. Work will continue on North Bend and is on target for being enclosed in November.

North Bend Elementary School
 

90% of the floors are poured.

70% of the exterior walls and bearing walls are complete.

55% of the roof trusses are installed.

45% of the roof decking is installed.

Water proofing is complete on most of the exterior walls.

Additional work underway:

  • The Gym roof has been installed; the roof at the east end will begin the week of 10/22.
  • Block bearing walls at the library working west toward the gym
  • Conduits and outlet boxes as walls are going up
  • Installing vent and drain lines
  • Grading site and installing sanitary-sewer and water main

New High School
 

95% of the exterior footings and concrete walls are complete.

80% complete with the site grading.

Work is underway on block walls at the gym, installation of drain lines and shower room plumbing, installing boxes and conduit as the wall is being put up.

BACK TO TOPPublic Forums:
Proposed attendance areas and grade level configurations
Thursday, October 4, 2007 at CC Elementary, Oxford
& Thursday, October 11, 2007 at CCA High School, Tiffin
In preparation for opening North Bend Elementary, the school board conducted forums to receive public comment on the proposals for attendance areas and grade configurations. 

The board will use the information received from the forums during a workshop session in November.

Transcripted notes from forums:

        xls  October 4

         xls October 11

DOCUMENTS | REVISED 10.22.07

NOTE: Each Microsoft Exel workbook includes multiple tabs. MS Word docA1_Attendance_Area_Parameters.doc

xls doc A2_Attendance_Area_Scenarios.2007.xls

xls docA3_Attendance_neighborhood_scenario 1.xls

xls docA4_Attending_History_Level.xls

xls docA5_Enrollment_Projections.xls

top

Construction progress at new facility sites
September 2007

NEW HIGH SCHOOL

HS progress September 07

 

 

  • Site grading 70% completed
  • Footings dug and foundation forms installed
  • Foundation concrete and some parking lot areas
    will be installed during September.

 

NORTH BEND ELEMENTARY
North Bend Elementary progress September 07
 

 

  • All footings completed
  • Gym walls in place
  • Some floors to be poured and installation of steel
    structure will begin in September.

Site Plans for New Facilities

Click on image link for larger view.

 

HS Site Plan North Bend site plan
High School Site Plan North Bend Site Plan

top

Groundbreaking ceremony for new Clear Creek Amana High School School held July 31, 2007

HS Groundbreaking - JUL 31, 2007

Tuesday, July 31, 2007
The Clear Creek Amana Community School District held a groundbreaking ceremony for its new high school school on Tuesday, July 31 at 11:00 a.m. located west of the current high school in Tiffin on highway 6 .

The new high school is scheduled to open in the fall of 2009. It will be the second of two new schools to be built in the district. The new elementary school, which is scheduled for completion in 2008, will be built in North Liberty. top

 

Groundbreaking Ceremony for new Clear Creek Amana Elementary School - North Bend Elementary

Groundbreaking for North Bend Elementary School, May 4, 2007

The Clear Creek Amana Community School District held a groundbreaking ceremony for its new elementary school on Friday, May 4 at 11:00 a.m. at the intersection of Kansas Avenue and 270th Street in North Liberty. The groundbreaking included the unveiling of the new name chosen by the school board. Welcome North Bend Elementary School!top

District Prepares for New Elementary School Bids
The CCA Board established the schedule for the required public notices and actions in preparation for accepting bids to construct the new elementary school at the regular meeting on February 15. The new elementary school will be built at the corner of 270th Street and Kansas Avenue in North Liberty with a scheduled opening for the start of the 2008 school year.

Key dates for the new elementary include:
March 7
Notice of Sealed Bid Process
March 15
Board Review & approval/
Public Hearing on Project Specifications
March 30
Opening of Bids
April 5
Acceptance of Bids
May 2007 - June 2008
Construction
August 2008
District occupancy of new building

As a public school, CCA is required to follow State Code regarding construction of new facilities. These requirements include:

  • All new construction of school facilities requires the use of an architect. (CCA has contracted with Shive-Hattery Architects and Engineers for the design of the new schools.)

  • Plans and specifications used for school buildings musts be submitted to the Iowa State Building Code Bureau, prior to the start of construction. These plans must include fire alarm plans, sprinkler system plans, site plans showing compliance with state accessibility codes and a Life Cycle Cost Analysis.

  • New construction in excess of $100,000 must follow a formal bid process. This process includes public notice of the intent to take bids, a public hearing on project specifications, receipt of closed bids and the award of contract to the lowest responsive, responsible bidder or rejection of all bids.

  • All bids must be accompanied by a deposit of money equal to at least five percent of the estimated total cost of the project.

topFinal Design Specifications Established for New Elementary

ELEMENTARY PLAN FEATURES:

• 300 student capacity,

• 52,000 Sq. Ft.

• Separate bus & pedestrian traffic loops

• Automated door entry system

• Energy efficient geo-thermal heating and cooling system.

The new elementary conceptual design was completed with the assistance of the CCA Design Committee through a series of meetings that occurred April through August 2006. The board has worked with the Shive-Hattery design and engineering team over the last few months to assure alignment of the design with the established project budget.

The base bid includes:

  • 18 classrooms, including specialized classrooms for art and music (Kindergarten classrooms have 1000 sq. ft.; remaining classrooms have 900 sq. ft. of space)

  • Two extended learning areas (See article on page 3 for additional information about these areas.)

  • Media center

  • Gymnasium (50 ft. X 70 ft. elementary-sized gym)

  • Multipurpose cafeteria, including kitchen and food storage areas

  • Office space (secretary, principal, counselor, nurse, AEA support staff)

  • Work areas for staff and volunteers

  • Restrooms, hallways, mechanical and engineering space

topNew High School Design Nearing Completion

The design process for the new high school is in the final stages of completion. The Design Committee, school staff and board have worked with architects and engineers from Shive-Hattery to develop the basic building design, including a potential new driveway access from Highway Six. The project is on schedule for a fall 2009 opening.

HS BUILDING DESIGN FEATURES:

• 600 student capacity

• 117,000 square feet

• Two story classroom wing

• 30 classrooms including 4 science labs*, specialized classrooms for art, technology and instructional enrichment
*revised 2.28.07

• Instrumental and vocal music classrooms with small group practice space

• media center with conference space

• multi-purpose/cafeteria; kitchen and food storage area

• competition sized gym and PE space

• Separate mat room and fitness area

• office space (counseling,health, activities, administration)

• mechanical and engineering space; restrooms, hallways

 

 

 

topFrequently Asked Questions

Where will the new buildings be located?


• The district acquired 55 acres of land west of the current high school in 2002. This land will be used to build the new high school.

• The district was given 16 acres of land in North Liberty that will be used to site the new elementar school at the corner of Kansas Avenue and 270th Street.
When will the new schools open?
 

• The new elementary school is scheduled to open at the start of the 2008 school year.

• The new high school is scheduled to open at the start of the 2009 school year.

Are there any additional revenue sources?
  • The district successfully applied for state grant funds that provided an additional $500,000 for the new elementary school. The 2006 bond referendum provided the required local match to secure this grant.

• In addition to the gift of land for the new elementary school, the City of North Liberty extended sewer and water connections at no cost, provided a paved street extension on Kansas Ave., and will provide paving along 270th St. in front of the school site prior to the school opening in
2008. These combined land and development gifts provided the CCA district an estimated cost savings of $500,000.

• The City of North Liberty has also offered the CCA CSD a $500,000 contribution to build an expanded gym (additional 4000 sq. ft.) in return for shared use of the gym after school hours, on weekend
and during the summer. This gift is contingent upon the district and the city entering into a shared
agreement.
What is a shared (28E) agreement?
 

The purpose of Iowa Code chapter 28E [joint exercise of governmental powers] is to permit state and local governments in Iowa to make efficient use of their powers by enabling them to provide joint services and facilities with other agencies and to co-operate in other ways of mutual advantage (Iowa Code, 28E.1).

Any such agreements under chapter 28E shall specify the following:

1. Its duration.

2. The precise nature of any separate legal or administrative entity created ...

3. Its purpose or purposes.

4. The manner of financing the joint or cooperative undertaking and of establishing and maintaining a
budget therefore.

5. The permissible method or methods to be employed in accomplishing the partial or complete termination of the agreement and for disposing of
property upon such partial or complete termination.

6. Any other necessary and proper matters (28E.5).

Has CCA developed a shared agreement with the City of North Liberty for shared gym use?
  • The CCA Board has reviewed shared agreements that exist between area schools and cities and asked for the development of a draft agreement for further consideration.
Does the new elementary have any features that may be added if the construction bids are less than the project budget?
 

• The district has requested several alternative items for consideration as part of the elementary school bid process. If the budget allows, the school will add items such as:

• additional kitchen equipment

• classroom and extended learning area casework

• terrazzo floors in hallways.

What construction work occurred at the Tiffin site this past fall?
 

• The sewer and water lines were extended across the school property in Tiffin last fall. This construction occurred as part of a four-way cost sharing agreement with the City of Tiffin, Deerview developers, a property owner to the west of the school and CCA CSD.

top

 

What questions do you have about the new facilities?

Send your questions to Carol Hopp at the district office.
Future facility project updates will continue to address frequently asked questions.